Petrol station construction, Kasnazan
Construction of two petrol and fuel stations in Erbil – Kasnazan, at a cost of $200,000. Delivered 2017–2018.
Construction of two petrol and fuel stations in Erbil – Kasnazan, at a cost of $200,000. Delivered 2017–2018.